Pre-Application & Outline Planning Drainage Strategy

A pre-application or outline drainage strategy establishes whether the scale and type of development you are proposing would be acceptable to the local planning authority, before you commit to a detailed design. You need one for most outline applications, and for pre-application advice where surface water is likely to be a constraint. Aegaea has produced them for schemes from single dwellings to 500+ unit developments, solar farms and schools.

Aegaea can support your planning application with a policy compliant outline drainage strategy, working with the Lead Local Flood Authority and Environment Agency so that minimal conditions are needed to achieve approval.

What is needed to support an Outline Planning Application?

Outline Planning is focused on the concept and principles of drainage. Due to it being more conceptual, it leads to conditions or more information being requested as planning consent is issued which doesn’t provide permission to start work.

The four questions below simplify what questions need to be answered to support a planning application.

  1. What is being proposed, and how will it impact the runoff of surface water post-construction?
  2. How will the increase in surface water runoff be mitigated post-development, and what SuDS could be used?
  3. Where could the sustainable urban drainage systems (SuDS) be located on the site? and;
  4. How will the runoff be discharged from the site, and at what rate, litres per second?

Your outline planning report will answer these questions with drainage calculations and a plan demonstrating the potential future arrangement.

It may not be as detailed as full planning or pre-construction, but it still has to be implementable and detailed enough to justify the selection and specific sizing of SuDS devices and products—including the tank size, pond size, green roof usage, etc.

Pre-application and outline planning projects we have supported

  • Minor Development – extensions to residential and commercial properties
  • Major Development - Commercial / Residential / Industrial / Energy / EIA
  • Residential Development 1 dwelling through to 500+
  • Solar Farms and Battery Storage facilities
  • Agricultural buildings – barns, stables, silos
  • Leisure and recreational facilities – hotels, adventure golf, stadiums, leisure centres
  • Schools and more.

How we can support your planning application

As part of our work, we have simplified what can be viewed as a complex planning document into the 7 steps below;

The SuDS process:

  1. Assess Site location and Data Review.
  2. Policy Requirements (National/Regional/Local)
  3. Undertake scientific engineering calculations of the existing Site against the Proposed Development
  4. Review the findings of the calculations against site conditions (site analysis/data review) to assess what SuDs could be adopted to mitigate surface water at the Site
  5. Outline the SuDS in an order (SuDs train) that provides as many benefits as possible (Water quantity, Water quality, Amenity, Biodiversity)
  6. Identify a point of discharge against the SuDS hierarchy and define the rate (litres per second l/s)
  7. Production of a drainage layout drawing to scale and supporting report.

As the project evolves, we regularly communicate with our clients about its progress to identify what is feasible and ensure that the solutions provided are achievable in terms of site design, cost, and sustainability. We welcome the opportunity to discuss your project.

Common questions

Here are answers to common questions about this work. If you would like to discuss your own site, we can help you work out what is needed.

The National Planning Policy Framework of 2019 introduced the use of SuDS as a requirement unless it is deemed to be inappropriate for the development.

When determining any planning applications, local planning authorities should ensure that flood risk is not increased elsewhere. Where appropriate, applications should be supported by a site-specific flood-risk assessments. Development should only be allowed in areas at risk of flooding where, in the light of this assessment (and the sequential and exception tests, as applicable) it can be demonstrated that:

a) within the site, the most vulnerable development is located in areas of lowest flood risk, unless there are overriding reasons to prefer a different location;

b) the development is appropriately flood resistant and resilient such that, in the event of a flood, it could be quickly brought back into use without significant refurbishment;

c) it incorporates sustainable drainage systems, unless there is clear evidence that this would be inappropriate;

d) any residual risk can be safely managed; and

e) safe access and escape routes are included where appropriate, as part of an agreed emergency plan.

This new policy means it’s highly encouraged to use sustainable drainage systems, however, there are limited exemptions.

A common exemption would be an extension atop the existing built footprint. If it doesn’t exceed the existing building footprint and will connect into former/existing roof drainage, it can be exempt from needing a new SuDS strategy.

Each application is unique and although this is a common exemption, we would strongly recommend liaison with your Local Planning Authority and Lead Local Flood Authority before proceeding with similar projects.

The main difference between outline planning and full planning is the level of detail that’s required. You need significantly more data and information in a full planning application than an outline plan. Outline planning could also be viewed as a well thought out conceptual plan.

Outline Planning is focused to the concept and principles of drainage. How will the runoff be mitigated post development? Where could the sustainable urban drainage systems be located on the site? How will water be discharged from the site? Planning Authorities will expect these questions to be answered, with surface water drainage calculations and a plan demonstrating the potential future arrangement.

Outline planning may not be as detailed as full planning or pre-construction, but it still has to be implementable and detailed enough to justify the selection and specific sizing of the chosen SuDS (such as tank size, etc).

Due to it being more conceptual, it can lead to more information being requested as planning consent is being issued before permission to start the works can go forward.

Each Surface Water Drainage Strategy is unique, however, typically our expert team can produce a surface water drainage strategy within 10 to 20 working days from receiving all necessary data. Much of this time-frame depends greatly on the size of the project, complexity of the site (brownfield, existing connections), environmental constraints (geology, topography, ground water etc.) and the amount of data that is already available. Review of all of these elements is required to allow our experts to cross review and interrogate each element and piece of data in order to provide you with a national planning policy compliant report for planning.

It is the responsibility of the client/applicant to source the majority of the datasets and necessary pieces of information. However, our experts are able to support in sourcing information and supporting you through the project. We have a network of specialists who can provide additional services as and when required.

If you’re looking for a much shorter time frame, our team can provide reports in an accelerated time-frame at an additional cost to meet your requirements. We’re able to provide this rapid service due to our teams experience of supporting our clients and the tried and tested methodologies and approaches.

Ideally, before. A pre-application or outline drainage strategy establishes whether the scale and type of development you are proposing is acceptable in drainage terms before you commit to a detailed design. Finding out at full planning that the layout cannot accommodate the required attenuation usually means reworking the scheme.

Where a site is constrained, early drainage input often shapes the developable area, so it is worth having before the masterplan is fixed rather than after.

Client feedback

What it’s like to work with us

Read all reviews on REVIEWS.io ↗

Pre-Application & Outline Planning Drainage Strategy

Get a quote for your site.

Tell us where your site is and what you’re planning. We’ll explain what’s needed and send a free, no-obligation quote.

Newsletter

Stay ahead of flood risk and planning changes

  • Policy and flood map changes, explained in plain English
  • Practical guidance for your next planning application
  • New projects and lessons from our consultants

No spam. Unsubscribe any time. By signing up, you agree to receive our newsletter and occasional updates. See our privacy policy for how we use your data.

Read the latest update →

Preview: signup not connected yet.