SEPA’s Position On Elevated Buildings

SEPA has just released further guidance with regard to elevated development located in areas of flood risk.
SEPA’s Position On Elevated Buildings

The Latest On Elevated Buildings (Formerly Known As Stilted Developments) In Flood Risk Areas

Elevated Building
Elevated Building

SEPA has just released further guidance with regard to elevated development located in areas of flood risk.

Elevated development (i.e. where structures such as pillars or stilts are used to raise a building above the expected flood water level) will not be opposed on flood risk ground by SEPA ifall of the below criteria are met:

  1. Sites must have been previously developed (i.e. a brownfield site) and be within a built-up area.

  2. The underside of the building must be above the height of the relevant design flood level, plus an allowance for freeboard, plus a separate allowance for climate change.

  3. The proposed development must have a neutral or better impact on floodplain capacity.

  4. Proposals must not create an island of development (i.e. development must adjoin developed areas outwith the future floodplain); and

  5. Safe, flood free pedestrian access and egress from the building to a place of safety outwith the future floodplain must be provided and secured in perpetuity.

  6. The development footprint and design as proposed cannot be located in lower risk areas elsewhere in the site where the use of elevated buildings would not be required.

SEPA defines an “island of development” as any building located above the design flood level but surrounded by lower ground at risk of flooding from all sides. SEPA makes it clear that the inclusion of a raised walkway that would act as a connection between the building and higher ground would not be acceptable.

A detailed flood risk assessment will be required to ensure all of the above circumstances are addressed.

Aegaea has successfully delivered Flood Risk Assessments throughout Scotland over the last decade, so please don’t hesitate to contact us if you would like to discuss your project.

Written and reviewed by

Douglas Swinbanks

Principal Flood Risk and Drainage Engineer, Scotland · MEng (Hons) MCIWEM

I am a Member of the Chartered Institution of Water and Environmental Management (CIWEM), a Principal Flood Risk Engineer and Hydrologist based in Edinburgh, and I lead Aegaea's Scotland branch.

View profile →LinkedIn ↗

↑ Back to top

Insights

Talk to us about your project

If this raises questions about your own site, we can help you work through them. Share your plans and any comments from the council, and we’ll send a free, no-obligation quote.

Newsletter

Stay ahead of flood risk and planning changes

  • Policy and flood map changes, explained in plain English
  • Practical guidance for your next planning application
  • New projects and lessons from our consultants

No spam. Unsubscribe any time. By signing up, you agree to receive our newsletter and occasional updates. See our privacy policy for how we use your data.

Read the latest update →

Preview: signup not connected yet.