Case Study2 min readAlex Brennan

Helios Renewable Energy Project DCO – Flood Modelling for Solar Development

Aegaea’s site-specific flood modelling supported the Essential Infrastructure - Helios Renewable Energy Project DCO application, addressing complex flood risk for a solar and energy storage scheme.
Case Study: Helios Renewable Energy Project DCO – Flood Modelling for Solar Development

Project in brief

Development consent

North YorkshireHelios solar and energy storage development

The question
Assess river flooding and tidal influence for a nationally significant infrastructure proposal.
Our work
Site-specific fluvial modelling with a tidal boundary, working with PFA Consulting.
Reported outcome
Development Consent granted for the project. The case records the consent stage, not operation of the scheme.
On this page

Overview

The Helios Renewable Energy Project is a large-scale solar farm incorporating energy storage, located on agricultural land in North Yorkshire, England (Essential Infrastructure). The project spans over 475 hectares and is designed to generate 190 MW of low-carbon electricity, contributing significantly to the UK’s renewable energy targets. As a Nationally Significant Infrastructure Project (NSIP), it required a Development Consent Order (DCO).

The site presented complex flood risk constraints, which needed to be carefully managed to meet planning policy requirements and ensure the project could progress safely through the Examination phase.

Aerial view of a solar farm
Aerial view of a solar farm

Aegaea’s Approach

Aegaea Limited worked closely with PFA Consulting Ltd to provide critical site-specific flood modelling for the project. Our modelling quantified the flood risk across the Helios site and informed the development of a proportionate mitigation scheme tailored to the solar farm’s layout and policy requirements. The outputs underpinned the Flood Risk Assessment and Environmental Statement, providing robust evidence to support the DCO application.

As part of the assessment, detailed fluvial flood modelling was undertaken with a tidal downstream boundary, simulating a range of design flood events and climate change scenarios. This included standard and extreme fluvial events, combined with future tidal conditions for the 2050s and 2070s epochs. Sensitivity testing was used to understand worst-case interactions between river flows and tidal levels, providing a robust basis for quantifying flood risk across the site in line with national policy requirements .

By working collaboratively with PFA Consulting, Aegaea ensured that the proposed development could be designed and constructed without increasing flood risk elsewhere on the site.

The Outcome

The Secretary of State for Energy Security and Net Zero granted Development Consent for the Helios Renewable Energy Project, enabling the project to proceed.

Aegaea’s flood modelling was instrumental in demonstrating that the project could safely manage complex surface water and drainage constraints. The collaboration highlights how expert technical input in flood risk assessment and modelling is essential to successfully deliver large-scale renewable energy projects in sensitive locations.

Written and reviewed by

Alex Brennan

Senior Hydraulic Modeller and GIS Technical Lead · BSc (Hons)

I am an experienced water sector specialist working at the intersection of hydraulic modelling and GIS automation.

View profile →LinkedIn ↗

↑ Back to top

Case studies

Talk to us about your project

If this raises questions about your own site, we can help you work through them. Share your plans and any comments from the council, and we’ll send a free, no-obligation quote.

Newsletter

Stay ahead of flood risk and planning changes

  • Policy and flood map changes, explained in plain English
  • Practical guidance for your next planning application
  • New projects and lessons from our consultants

No spam. Unsubscribe any time. By signing up, you agree to receive our newsletter and occasional updates. See our privacy policy for how we use your data.

Read the latest update →

Preview: signup not connected yet.