Aegaea

Quick links

↑ ↓ to choose · Enter to open · Esc to closeSearch stays in your browser.

Technical Insight3 min readDouglas Swinbanks

Flood Risk Assessment in Scotland – The Future Fluvial Flood Risk Area

During the early stages of your project, it is vitally important that consideration is given to flood risk and understanding the Flood Risk Area.
Flood Risk Assessment in Scotland – The Future Fluvial Flood Risk Area
On this page

During the early stages of your project, it is vitally important that consideration is given to flood risk and understanding the Flood Risk Area.

Generally, the first port of call is to review your site against SEPA’s online fluvial flood maps, which provide an indication of the flood hazard across Scotland. However, you must be made aware that SEPA’s fluvial flood mapping has been produced at the national scale using national datasets and a consistent methodology, and should not be used for site specific assessment¹.

SEPA’s “Future Flood Maps” currently provide the closest freely available representation of the Flood Risk Area from Fluvial sources. However, there are two key factors which have not been included but are now frequently required to be addressed by both SEPA and the Local Authority:

  1. The updated modelled climate change allowance, and;
  2. Structure Blockage potential

Climate Change Allowance

As SEPA explain in their published Explanatory note², the modelled climate change allowances used for their online mapping has now been superseded by those values presented in their Climate Change Allowances for Flood Risk Planning, updated in August 2024³. The table below provides both the values modelled by SEPA as part of their online mapping dataset, and the current predictions which are required to be modelled as part of any Flood Risk Assessment:

River BasinSEPA Future Flood Risk Mapping – Modelled AllowanceLatest Predictions (Required for FRA)Increase
Large Catchment ( >50km2)Smaller Catchment ( <30km2)
North Highland374042
North East243437
Tay355339
Forth405639
Tweed335935
Orkney & Shetland414040
West Highland565848
Argyll565946
Clyde444941
Solway445338

¹ https://beta.sepa.scot/flooding/prepare-for-flooding/flooding-faqs/flood-maps-faqs/ ² https://www.sepa.org.uk/media/zu0fbcv3/futurefloodmap_explanatory_note_version_4_november_2023.pdf ³ Climate change allowances for flood risk assessment in land use planning Version 5

The table above shows that for nearly all River Basins across Scotland, SEPA’s Future Flood Risk Mapping underestimate the impact of climate change in relation to current predictions. In particular for larger rivers within the Tweed catchment, in which current predictions are 26% greater to those modelled as part of SEPA’s dataset.

Blockage

Our recent experience has shown that SEPA now considers the Flood Risk Area as the 1 in 200 Year Event, plus climate change, plus an appropriate blockage of nearby structures. SEPA recommend that a 75% blockage is applied at the critical structures to demonstrate the Flood Risk Area. However, on occasions, a 100% blockage may be requested.

SEPA do not model blockages within their online mapping dataset (with the exception of culverts larger than 50m in length), which are modelled as 100% blockages in most cases.

So if your site is shown to be located close to SEPA’s Future Fluvial Flood Risk Extent, and/or close to a structure, then there could well be areas within your site that might fall within the Flood Risk Area following a detailed FRA.

One final thing to note, is that for smaller catchments, SEPA’s modelled extents are displayed as “pluvial” flooding, rather than “fluvial” (as SEPA do not present fluvial flood extents for catchments smaller than 3.0km².

SEPA’s pluvial extents currently include no uplift for climate change, so please do get in touch if your development is shown to be located close to an area at risk of flooding, from any source.

Written and reviewed by

Douglas Swinbanks

Principal Flood Risk and Drainage Engineer, Scotland · MEng (Hons) MCIWEM

I am a Member of the Chartered Institution of Water and Environmental Management (CIWEM), a Principal Flood Risk Engineer and Hydrologist based in Edinburgh, and I lead Aegaea's Scotland branch.

View profile →LinkedIn ↗

↑ Back to top

Insights

Talk to us about your project

If this raises questions about your own site, we can help you work through them. Share your plans and any comments from the council, and we’ll send a free, no-obligation quote.

Newsletter

Stay ahead of flood risk and planning changes

  • Policy and flood map changes, explained in plain English
  • Practical guidance for your next planning application
  • New projects and lessons from our consultants

No spam. Unsubscribe any time. By signing up, you agree to receive our newsletter and occasional updates. See our privacy policy for how we use your data.

Read the latest update →

Preview: signup not connected yet.