Aegaea supported a client on recent enforcement notice appeal in Sussex through detailed hydraulic modelling to demonstrate that an already constructed pond and embankment would result in a decrease in flood risk to the surrounding area thus gaining the planning inspector’s support.
Case Study: Appeal Allowed for Retrospective Pond Development

Project in brief

Appeal decision

SussexAn enlarged pond and associated embankment

The question
Assess the effect of already-completed earthworks on downstream flooding.
Our work
Baseline, as-built and embankment breach modelling.
Reported outcome
The published case reports an allowed enforcement appeal, supported by comparison of the flood scenarios.
On this page

Project Overview

The client in this instance had excavated a larger pond in place of an existing pond, with the construction of an associated embankment to facilitate the impoundment of the larger volume of water. This had been done without planning permission, hence the Local Planning Authority (LPA) served an enforcement notice to the client.

The existing/ pre-development pond, was fed by a small ditch which flowed through the site. The pond was enlarged beyond the pre-development state.

Due to its location on an existing ditch, the area was defined as being at risk of pluvial (surface water) flooding as per the EA’s Risk of Flooding from Surface Water (RoFSW) dataset. Due to the nature of the scheme as a pond, it is considered Water Compatible in accordance with the NPPF. However, given extent of landscaping that had taken place, there was a requirement to assess whether the works had increased flood risk offsite.

To do this, a baseline (pre-excavation) hydraulic model was first developed utilising available topographic information, from which we could then compare the post-development, as-built scenario. The post-development, as-built scenario was represented and informed by detailed topographic survey information to confirm pond bed and bank levels, alongside the details of the flow control structure (pipe outlet) in the embankment.

Enlarged pond and embankment at the site
Enlarged pond and embankment at the site

Results

The pre and post-development modelling demonstrated that the excavation of the enlarged pond and associated embankment, would result in a reduction in flood depth of up to 0.11m in the ‘design’ 1 in 100 year event with a 45% allowance for climate change. There was also a slight reduction in downstream flood extent anticipated through the modelling as a result of the works.

Modelled change in flood depth, design versus baseline, 1 in 100 year plus 45% climate change
Modelled change in flood depth, design versus baseline, 1 in 100 year plus 45% climate change

Given the impoundment of a larger volume of water (hence the downstream reduction in flood risk), the LLFA raised concerns that a sudden failure, or ‘breach’ of the embankment could result in sudden downstream inundation, posing a greater risk than the pre-development scenario. As such, Aegaea also conducted breach modelling of the embankment in two scenarios – one whereby the embankment failed during a ‘dry day’ event, where the pond was full of water and the embankment failed with no additional rainfall; and the second a ‘wet day’ event, whereby the pond is full, and a 1 in 100 year +CC (45%) event coincided with the breach of the embankment. The breach modelling demonstrated that downstream risk to buildings was not considerably increased.

The inspector was of the opinion that the works had decreased flood risk downstream due to the impounding of the water and that any increase in risk in a breach scenario would be outweighed by the low likelihood of such an event occurring.

Modelled change in flood depth, design versus baseline, 1 in 100 year plus 45% climate changeLong section through the site
Modelled change in flood depth, design versus baseline, 1 in 100 year plus 45% climate change

Written and reviewed by

Nick Darling-Drewett

Consultancy Manager and Lead Flood Risk Consultant · BSc MCIWEM AMIEnvSC

I am a Member of the Chartered Institution of Water and Environmental Management (CIWEM) and an Associate Member of the Institution of Environmental Sciences (AMIEnvSc).

View profile →LinkedIn ↗

↑ Back to top

Case studies

Talk to us about your project

If this raises questions about your own site, we can help you work through them. Share your plans and any comments from the council, and we’ll send a free, no-obligation quote.

Newsletter

Stay ahead of flood risk and planning changes

  • Policy and flood map changes, explained in plain English
  • Practical guidance for your next planning application
  • New projects and lessons from our consultants

No spam. Unsubscribe any time. By signing up, you agree to receive our newsletter and occasional updates. See our privacy policy for how we use your data.

Read the latest update →

Preview: signup not connected yet.