Flood Risk Assessments
We are experts in flood risk, water and environment, specialising in flood risk assessments, surface water drainage strategies and flood modelling.
Our expertise is helping you unlock the development potential of your site, no matter what the size – from house extensions to 5000+ units, Aegaea works alongside you every step of the way.
Without a Flood Risk Assessment, your planning application could be rejected. Each of our Flood Risk Assessments are tailored to your development, meeting all local planning requirements, to help you better understand and mitigate the risk of flooding to your site.
Flood Risk Assessment Consultants
Without a Flood Risk Assessment, your planning application could be rejected. Each of our Flood Risk Assessments are tailored to your development, meeting all local planning requirements, to help you better understand and mitigate the risk of flooding to your site.
Why not get in touch with the team on 020 8156 6076 today for a free quotation or fill in our quote request form below.
Professional, comprehensive flood risk assessments, aligned to all local and national planning policies written by subject matter experts.
Our flood risk assessment expertise is unlocking development potential
Aegaea work alongside home owners, private developers, planning consultants, architects, local authorities, international development agencies and contractors. We are specialists at unlocking hidden value in land – using decades of experience to guide developments through planning, challenging EA flood zones and creating unique flood modelling solutions to drive your application. So whether it’s an exception test, permitted development, extension, or a 5,000 unit major development, Aegaea know exactly how to help you.
It’s your development, it’s personal, and it needs an expert that understands the nuance and details that make a successful FRA for planning.
Every quote from Aegaea is free, unique and bespoke to your requirements, it’s just one of the ways that we set ourselves apart.
Our expert consultants take the time to understand what you need and when you need it – delivering high quality, professional reports that have helped hundreds of customers obtain planning permission.
Leading Flood Risk Consultants from Aegaea
When is a Flood Risk Assessment required?
Find out when and if you need a Flood Risk Assessment
What is a flood zone?
What are the flood zones? How do they affect planning permission?
What about exception and sequential tests?
How can working with us help you to pass exception and sequential tests?
Flood Risk Assessment FAQs
A Flood Risk Assessment (also known as an FRA) is a planning document that allows clients and local authorities to assess the flood risk to a site. This allows local authorities to understand whether a development will be safe to build in its current state in relation to different types of flooding.
FRA’s are necessary for many different project sizes, from new home extensions to constructing multiple properties on a large piece of land. It assesses multiple sources of flooding to your existing and future development/site, whilst referencing National and Local Planning Policies.
The flood assessment further establishes whether any other third parties could provide comments about the development (such as; Environment Agency, Local Drainage Boards, Lead Local Flood Authority, etc).
The key outcomes of the flooding risk assessment in a basic form are;
- Establish the risk of flooding to the site
- Cross-reference the findings from a review of the flood data against national and local planning policy
- Confirm what is and is not viable based on the initial data review
- Review proposed design/layout and comment on whether the development would be acceptable for planning
- Assess impacts onsite and offsite as a result of constructing the development
- Advise and provide recommendations of what mitigation measures could be introduced to prevent flooding impacting the site, its future users/occupants, and whether it increases the risk of flooding elsewhere, post-construction.
It should be noted that even if a development can be shown to be mitigated from the flood risk, planning authorities still may not deem it acceptable for construction. Certain developments have stricter planning and are therefore more stringent on what is and isn’t acceptable. This is something we can advise you on upfront during our initial consultation so you’ll know if there are some additional complexities with your project or the flood zone it’s located in.
Read more about what a flood risk assessment is.
In England, a FRA is required when the development or site is located in Flood Zone 2 and 3 according to the Environment Agency flood map for planning. An FRA is also required if the Site is in Flood Zone 1 when it is equal to or greater than 1 hectare in size or if it’s located within a Critical Drainage Area regardless of its size.
Even with this in mind, the National Planning Policy Framework requires an FRA to be used to assess all sources of flooding. Therefore an FRA could be requested even if your site doesn’t fit these requirements. Especially if there is a history of flooding, such as from a sewer or reservoir.
If your site is within 20 meters of an Environment Agency (EA) Main River, it’s also highly likely you’ll be required to provide an FRA with a particular focus on the EA Guidance.
It’s important to understand if you need a flood risk assessment for your development early on in your idea phase. For starters, you’ll want to know if your development is actually at risk of flooding. If your site is within a flood zone, any application submitted without an FRA will likely be rejected.
When this happens, you may have to make some costly changes to your plans, not to mention delays. These changes could range from increasing the floor height to moving buildings elsewhere on the site. It’ll be much easier and cost effective if you know going into the design phase where you need to mitigate your risks.
Thankfully, the Environment Agency provide a free postcode checker to establish whether you’re in a flood zone and therefore would likely require a Flood Risk Assessment to gain planning permission. We’ve included an example map of London below.
You can access the EA Flood Map for Planning here
By using the EA Flood Map, you can see if your site is located in a lightly shaded blue area (Flood Zone 2) or a dark shaded blue area (Flood Zone 3). Both of these mean your site is at risk of flooding and any future development would then require a Flood Risk Assessment. This isn’t entirely inclusive, as there are many sites not within Flood Zone 2 or 3 that will also require an FRA, but it’s a good starting point.
If you want confirmation, you should seek advice from an expert.
If your site is located within a flood zone, that doesn’t mean it’s the end of your development plans. Our team has supported many complex projects, including large developments in Flood Zone 3b (the greatest flood zone risk in the English Planning System). In fact, we really enjoy making these projects work. If you have any questions about the viability of your project, or understanding what flood zone your project is within, don’t hesitate to contact our team.
There are 3 main flood zones used in England under the National Planning Policy Framework and Environment Agency categorisation. Flood Zone 1, 2, and 3, with 1 being the lowest risk and 3 being the highest. There is, however, a fourth category for functional floodplains, known as Flood Zone 3b. This is not shown on the EA flood map for planning but we’ve discussed it more below.
Flood zones are derived by hydraulic computational models produced by the EA or private ownership. England has a detailed network of rivers and it is of national importance to establish which rivers and areas in the country could be more susceptible to flooding from a fluvial or tidal source (rivers and sea).
The three main flood zones are categorised on the EA flood map as;
- Flood Zone 1 – Low risk of flooding from rivers or seas – no blue shading
- Flood Zone 2 – Medium risk of flooding from rivers or seas – light blue colour
- Flood Zone 3 – High risk of flooding from rivers or seas – dark blue colour
However, Flood Zone 3 is unique in that it contains two zones;
- Flood Zone 3a, and;
- Flood Zone 3b – Functional Floodplain
The reason these have been further split is because they could be the difference between a development being accepted at planning, or not being rejected.
To provide greater context of the two flood zones we’ve included a table extracted from the National Planning Practice Guidance – Flood Risk Vulnerability and Flood Zone Compatibility. The table sets out the flood zones on the left column and the vulnerability of uses on the top row. To provide more context of what the vulnerability classifications include, we’ve included two examples;
More Vulnerable
- Hospitals
- Residential institutions such as residential care homes, children’s homes, social services homes, prisons, and hostels.
- Buildings used for dwelling houses, student halls of residence, drinking establishments, nightclubs, and hotels.
- Sites used for holiday or short-let caravans and camping, subject to a specific warning and evacuation plan.
Less Vulnerable
- Police, ambulance, and fire stations which are not required to be operational during flooding.
- Buildings used for shops; financial, professional and other services; restaurants, cafes and hot food takeaways; offices; general industry, storage, and distribution; non-residential institutions not included in the ‘more vulnerable’ class; and assembly, and leisure.
- Land and buildings used for agriculture and forestry.
The aim of the sequential test is to steer new development to areas with the lowest risk of flooding. Development should not be allocated or permitted if there are reasonably available sites appropriate for the proposed development in areas with a lower risk of flooding. The strategic flood risk assessment will provide the basis for applying this test. The sequential approach should be used in areas known to be at risk now or in the future from any form of flooding.
The National Planning Policy Framework (NPPF) details that all plans and strategic policies informed by a Strategic Flood Risk Assessment should apply a sequential, risk-based approach to the location of the development. Inappropriate development in areas at risk of flooding should be avoided by directing development away from areas at high risk. This isn’t necessarily always possible and when this occurs the development should be made safe for its lifetime, specific to its use and without increasing flood risk elsewhere.
The sequential risk-based approach to the location of development should also consider the current and future impacts of climate change. In circumstances where it is demonstrated that the site could be at risk of flooding or is currently in a flood zone, then it is necessary to apply the Exception Test which is discussed below in greater detail.
In summary, the sequential test is required to be applied for strategic planning purposes reviewing site allocations and the flood zones they are located within to support the Local Plan. The Sequential Test can also be applied for single planning applications. In both instances, it is encouraged that new development should be located in areas of lowest flood risk – Flood Zone 1.
If your site is located in Flood Zone 2 or 3 then it could be requested by the Local Planning Authority and Lead Local Flood Authority to produce a Sequential Test, which justifies why development of your site in a flood zone over another which is not, is preferred and should be considered.
It should be further noted that where planning applications come forward on sites allocated in the development plan through the sequential test, applicants need not apply the sequential test. This is because it has already been conducted by the Lead Local Flood Authority / Local Planning Authority.
To discover whether your development could require a sequential test as well as a Flood Risk Assessment contact us and we can work with you to talk through your site, aspirations of development and how best to mitigate flood risk.
The Exception Test is necessary when a development is located in a flood zone.
The need for the exception test will depend on the potential vulnerability of the site and of the development proposed.This is in line with the Flood Risk Vulnerability Classification set out in National Planning Policy Guidance.
The Exception Test consists of two parts. Both elements should be satisfied for the development to be allocated (Development Plan) or permitted (planning application).
For the exception test to be passed it should be demonstrated that:
The development would provide wider sustainability benefits to the community that outweigh the flood risk;
The development will be safe for its lifetime taking account of the vulnerability of its users, without increasing flood risk elsewhere, and, where possible, will reduce flood risk overall.
A professionally written, researched and thought-out Flood Risk Assessment can add real value to your planning application. It can reduce costs of the application process through redesign, time, and water management.
Our highly experienced team can review developments against the policy requirements and flood zones. We then use our industry experience and knowledge of local regions to make sure that we get you the right answer. We do this all for a highly competitive price, with no “one size fits all” quotes.
There are a lot of different parameters that can influence the time it takes to complete an FRA. Each project is unique and has different flood risks, designs, environmental conditions, topography, historic uses, and are subject to different planning policies. All of these can affect the time it takes for a flood risk assessment to be completed. The industry standard for an FRA is around 4 to 6 weeks.
Our team, however, have experience in supporting over 1,000 projects and have developed methods and techniques to analyse data efficiently and effectively review every aspect in a timely manner. On average, our FRA reports take 5 to 10 working days once we have received the necessary data.
If a site is located in Flood Zone 2 or 3, generally we would request data from the Environmental Agency (EA), or the relevant governing agency / third party. The Environment Agency have a statutory 20 working day (4 weeks) turnaround for all enquiries, including data. This turnaround time is echoed by most third party providers.
From then, we will conduct a thorough analysis with industry leading software and our in house tools. Once this is done, we’ll review the results with you and examine the risk of flooding before we complete the report. We make sure to keep you up-to-date throughout the whole process so you’re always aware of timelines. That way, you can get on with organising the rest of the planning application.
The key outcomes of the assessment in a basic form are;
-
Establish the risk of flooding to the Site from multiple sources – Watercourse, Coastal, Rainfall, Groundwater and Sewer as well as residual risks these can include canal and reservoir flooding and even breach/ failure of defences where required.
-
Cross-reference of the findings from a review of the flood data against planning policy
-
Advise, consultant and confirm what is and is not viable based on the initial data review
-
Review proposed design/layout and comment on whether the development would be acceptable for planning
-
Assess impacts onsite and offsite as a result of constructing the development
-
Advise and provide recommendations of what mitigation measures could be introduced to prevent flooding impacting the Site, its future users/occupants, and whether it increases the risk of flooding elsewhere, post-construction.
Also, it should be noted that just because a development can be prevented from flooding, it does not make it acceptable to be constructed. There are certain developments where the stringency of planning is less, and more is accepted in terms of what is an acceptable level of flooding or risk to future users.