We help you understand flood risk to your development in Wales and prepare a Flood Consequence Assessment where needed. We explain how the relevant planning requirements affect your proposal and work with your team on the evidence and design options.
Flood consequence assessments for your Welsh development
We work with your wider team to explain the options and develop an assessment that fits the site and proposal.
A flood consequence assessment is a requirement in Wales for developing in a flood risk area. It is analogous to a Flood Risk Assessment in England, but uses slightly different criteria for approval as it falls under Planning Policy Wales (PPW), rather than NPPF.
We take time to understand your plans, the information already available and your planning timetable. Whether you are proposing an extension or a larger development, we can explain the assessment involved and provide a quote tailored to the work required.
Do I Need a Flood Consequence Assessment?
Ultimately, you need to check with your local planning authority if you need to provide a Flood Consequence Assessment (FCA) as part of your planning application, however you will likely need one if you are
- developing in Flood Zone 2 or 3, or in a TAN15 Defended Zone,
- to support an application for a flood risk activity permit,
- developing in Flood Zone 2 or 3 for surface water and small watercourses, or on a site outside those zones that could affect surface water or ordinary watercourse flows.
The FCA has to be carried out by a suitably qualified person, such as a flood management consultant, and must demonstrate:
- The flood risks to your development
- An assessment of the flood consequences of the development, for a range of scenarios up to and including the 0.1% (1 in 1,000) annual chance event
- That the development does not increase flood risk elsewhere
- How you will manage or mitigate against flood risk to, or caused by, your development
- A consideration of climate change in line with current government guidance
Alternatively, you can speak to one of our experts, and we can do all that for you! We have worked across Wales on behalf of private developers, Schools, Power Generation schemes, and local authorities, so we’re well placed to help.
What Are The Welsh Flood Zones?
Wales uses Flood Zones 1, 2 and 3, split by the source of flooding:
- rivers
- the sea
- surface water and small watercourses
TAN15 Defended Zones are also mapped. The Flood Map for Planning, published by Natural Resources Wales, is “the starting point for consideration of flood risk in the planning system”, with the Flood Risk Assessment Wales (FRAW) map showing current risk.
These zones are defined in Technical Advice Note 15 (TAN15) and are part of Welsh planning policy.
The old Zones A, B, C1 and C2, and the Development Advice Map that showed them, belong to the 2004 version of TAN15, which has been replaced.
What is TAN15 In Wales?
TAN15 is the advisory note relating to development and Flood Risk and forms part of Planning Policy Wales.
It is one of a number of TAN documents relating to requirements for developers.
The current TAN15 was published in March 2025. It replaces Technical Advice Note 14 (1998) and Technical Advice Note 15 (2004), and “Development Plans and planning decisions should no longer refer to those documents”.
Its fundamental principles are to restrict new development in Flood Zone 3 and to prioritise all types of development to Flood Zone 1.
Wales uses three vulnerability categories, where England uses five: highly vulnerable, less vulnerable and water compatible development. All residential development is highly vulnerable, including hotels, Gypsy and Traveller sites, caravan parks and camping sites. So are schools, childcare, colleges, universities, hospitals, GP surgeries and emergency services.
The Justification Test
The four-part justification test in the 2004 version of TAN15, which relied on Zone C1 of the Development Advice Map, no longer applies.
Under the current TAN15 there is no requirement to justify the location of householder development. For anything else, talk to us early about how the current TAN15 applies to your site.
The Acceptability of Consequences
The Flood Consequence Assessment must consider a range of flooding scenarios up to and including the event with a 0.1% (1 in 1,000) chance of occurring in any year, with an allowance for climate change.
Under the current TAN15, whether development can go ahead turns on whether the consequences of flooding can be safely managed, including its effects on flood risk elsewhere. The thresholds for this are set out in Figures 5 and 6 of TAN15.
These thresholds are highly detailed and usually will require flood modelling in order to prove that they have been met. It is therefore always sensible to engage with NRW and the local authorities early to ensure that their requirements in terms of scale of assessment are understood clearly. Contact us for more.